by David | Nov 19, 2021 | Case Studies
Wastewater operators for the city of Cashmere had a messy and dangerous problem. The lift station serving a subdivision of the Washington town was routinely clogging up with stringy materials and elastics. The pair of pumps could not handle the ragging and the city...
by David | Oct 15, 2021 | Case Studies, Uncategorized
The ABB ACQ Water drive offers high efficiency with an easier-to-use interface, as well as quiet operation. The drive features low energy consumption and optimal motor control, with a built-in energy control mode, and energy calculators to help the users monitor and...